Inspection & conditions

Prepare a traceable first article inspection record

Determine the applicable contract and revision, then plan traceable verification of design characteristics and required process/material evidence.

What to prepare

Keep the controlled drawing/model revision, characteristic identifiers, verification methods and results, material/process records and nonconformance dispositions together. A characteristic may require documentary evidence rather than one physical dimensional reading.

Scope follows the contract

SAE AS9102C describes FAI performance and documentation and supplements customer/regulatory requirements. Its existence does not make this webpage or every aerospace part automatically subject to the same inspection contract.

Changes can reopen the task

Evaluate product and process changes against the applicable requirements to determine whether a full or partial FAI is needed. FAI is not necessarily a one-time check of the first physical part ever produced.

Continue your task

All tolerance and surface references →

Sources and review scope

Reviewed 23 October 2026. Arithmetic examples are labelled separately from source-table facts and standard scope.

SAE AS9102C

2023-06-28 revision, public scope for FAI performance/documentation. Supplements applicable customer/regulatory requirements.

Open the original source ↗
Boeing supplier first article inspection

Customer-specific planning and change considerations; not a universal requirement for all products.

Open the original source ↗